Drury southbound on-ramp will be closed 24/7 from 9pm Sunday 13 September
13 September @ 9:00 pm - 28 September @ 5:00 am UTC+0
- The Drury southbound on-ramp will be closed 24/7 from 9pm Sunday 13 September, for up to 2 weeks – reopening no later than 5am Monday 28 September. This full closure of the southbound on-ramp is required to lay stormwater pipes under the Drury southbound on-ramp, in close proximity to Great South Road.